Slit Drainage System Newcastle

Turf Drain Australia has recently completed slit drainage works at The University of Newcastle.

Enquire

This project involved the supply and installation of a sports field slit drainage system to the universities No.3 sports field area.

The No3 sports field consists of two rugby league fields and one baseball diamond. The sports field slit drainage system was installed in and around the baseball diamond and included the two sports fields.

The slit drainage system required 375m x 160mm slotted flexi pipe mainline, 4800lm x 50mm slotted flexi pipe carrier lines and 7990lm x gravel/sand collector lines.

This entire project was completed in twelve days in early March ’15 and back in use at the beginning of April ‘15. The sports field has significant use from the university itself as well as being a training facility for the Newcastle Knights and Newcastle Jets rugby league teams.

Turf Drain Australia would like to thank The University of Newcastle for the opportunity to complete these works.